Projects undertaken include exterior building cleaning (what a difference!), parking lot resealing and painting, and the long-awaited track repair. Images of the track show the newly asphalted surface after the old rubber top was removed and the area was regraded. A new rubber top will be coming soon. The ‘Super Gals’ may run even faster this year.